Skip to main content
U.S. flag

An official website of the United States government

Preconstruction and postconstruction ground-water levels, Lock and Dam 4, Red River Valley, Louisiana

January 1, 1979

Proposed construction of a series of locks and dams in the Red River in Louisiana will cause a permanent increase in average river stage. The potentiometric surface of the shallow alluvial aquifer and the water table in the fine-grained material confining the aquifer will be affected. The purpose of this study, using digital-modeling techniques, was to predict the average postconstruction potentiometric surface (steady state) and the water table (nonsteady state) so that potential effects of the water-level changes could be evaluated. Plans for lock and dam 4 at realined mile 154 (kilometer 250) above the mouth of the Red River call for a pool elevation of 115 feet (35 meters) and will cause an average increase in river stage ranging from 24 to 4.5 feet (7 to 1.4 meters). As a result, ground-water levels will be raised 1 foot (0.3 meter) or more between the Red River and Bayou Pierre from the dam to Coushatta , and below Campti, east of the river. The potentiometric surface may be at or near land surface in low areas between the Red River and Bayou Pierre, and above land surface locally upstream from the dam. The magnitude of ground-water-level fluctuations near the river will be reduced to less than half the present range.

Publication Year 1979
Title Preconstruction and postconstruction ground-water levels, Lock and Dam 4, Red River Valley, Louisiana
DOI 10.3133/ofr79921
Authors A. H. Ludwig, J. E. Reed
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 79-921
Index ID ofr79921
Record Source USGS Publications Warehouse