USGS field office chief Craig Painter shares his thoughts about the What's the Big Idea? innovation event at Kansas Water Science Center on Sept 2., 2015.
Videos
The USGS is a science organization that provides impartial information on the health of our ecosystems and environment, the natural hazards that threaten us, the natural resources we rely on, the impacts of climate and land-use change, and the core science systems that help us provide timely, relevant, and useable information.
USGS field office chief Craig Painter shares his thoughts about the What's the Big Idea? innovation event at Kansas Water Science Center on Sept 2., 2015.
USGS hydrologist Arin Peters shares his thoughts about the What's the Big Idea? innovation event at Kansas Water Science Center on Sept 2., 2015.
USGS hydrologist Arin Peters shares his thoughts about the What's the Big Idea? innovation event at Kansas Water Science Center on Sept 2., 2015.
Barter Island sits at the top of the Arctic National Wildlife Refuge in Alaska, and with the Arctic facing quickly rising temperatures, USGS wants to investigate what’s causing the North Slope bluffs to erode so quickly.
Barter Island sits at the top of the Arctic National Wildlife Refuge in Alaska, and with the Arctic facing quickly rising temperatures, USGS wants to investigate what’s causing the North Slope bluffs to erode so quickly.
by Justin Rubinstein, USGS Research Geophysicist
by Justin Rubinstein, USGS Research Geophysicist
Permanent Site: K1 West Transect; Depth: 6.0 Meters (19.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.
Permanent Site: K1 West Transect; Depth: 6.0 Meters (19.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.
Permanent Site: A2 East Transect; Depth: 12.4 Meters (Feet 40.8); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.
Permanent Site: A2 East Transect; Depth: 12.4 Meters (Feet 40.8); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.
Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.
Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.
Permanent Site: F2 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Visibility is poor on video due to a large amount of surge on the day of the dive.
Permanent Site: F2 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Visibility is poor on video due to a large amount of surge on the day of the dive.
Presents the USGS Precipitation Runoff Modeling System (PRMS) climate distribution modules.
Presents the USGS Precipitation Runoff Modeling System (PRMS) climate distribution modules.
Demonstration of how to run USGS Precipitation Runoff Modeling System (PRMS) with the graphical user interface.
Demonstration of how to run USGS Precipitation Runoff Modeling System (PRMS) with the graphical user interface.
Parameter sensitivity analysis of USGS Precipitation Runoff Modeling System (PRMS) using the Fourier Amplitude Sensitivity Test algorithm.
Parameter sensitivity analysis of USGS Precipitation Runoff Modeling System (PRMS) using the Fourier Amplitude Sensitivity Test algorithm.
Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).
Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).
Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).
Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).
Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.
Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.
Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.
Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.
Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.
Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.
Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).
Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).
Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).
Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).
Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.