Geologic and seismic investigations, relocation of Route 3, grade separation at Route 62, southeast ramp in Bedford, Mass.

January 1, 1954

The relocation of Route 3 in Bedford, Mass. requires extensive cuts for a grade separation at Route 62. This report contains only the results of the geologic and seismic studies that were made for the purpose of obtaining information that would aid in the construction of the inner and outer loops of the southeast ramp. The studies represent part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey. The work was performed in July 1953.


The site is located in the Wilmington and Lexington 7-1/2-minute quadrangle maps of the United States Geological Survey. Mr. M. E. Chandler and Mr. W. L. Carney, Massachusetts Department of Public works' Engineers, performed all pertinent survey work required for this project, and prepared the essential plans and profiles. Mr. Chandler also operated the seismic equipment and assisted in the preparation of the seismic velocity data.

Publication Year 1954
Title Geologic and seismic investigations, relocation of Route 3, grade separation at Route 62, southeast ramp in Bedford, Mass.
DOI 10.3133/ofr54190
Authors James E. May
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 54-190
Index ID ofr54190
Record Source USGS Publications Warehouse