EDNA Methodology Stage 1B
![EDNA Methodology Stage 1B](https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/styles/full_width/public/thumbnails/image/egg1_5.jpg?itok=UNM4erw3)
Detailed Description
The Pfafstetter code is based on the methodology. Within a watershed boundary, the mainstem streamline is numbered one, and the four largest tributaries off the mainstem are assigned even numbered basins (2, 4, 6, & 8)
Sources/Usage
Public Domain.