Installation of an ashmeter and sampling.
![Installation of an ashmeter and sampling....](https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/styles/full_width/public/vhp_img3188.jpg?itok=k4ISqyB8)
Detailed Description
A) Example of an ashmeter deployed in the backyard of Rodrigo Ruiz on January 14, 2012 (Pillate); B) An example of a thin (1.1 mm-thick) deposit collected March 14, 2012 in Pillate, from the February 4, 2012 eruption. From Bernard (2013).