Particle size analysis of the surface riverbed material
Detailed Description
Gary Barton (USGS) and Jeff Laufle (U.S. Army Corps of Engineers) carried out a particle size analysis of the surface riverbed material on the right bank (facing downstream) of the Snake River about three miles below Ice Harbor Dam near Burbank, WA.
Sources/Usage
Public Domain.