Skip to main content
U.S. flag

An official website of the United States government

C1 East Transect – 2015

Right-click and save to download

Detailed Description

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (1:36, 2:20 seconds). Invertebrates are scarce and are almost exclusively the ornate tubeworm Diopatra ornata (appears as small clumps of seaweed, eelgrass and detritus (0:30, 1:34 seconds). Visibility at site was very poor.
 

Details

Length:
00:02:47

Sources/Usage

Public Domain.