Site-level schematic of RSET and benchmark design

Detailed Description
Site-level schematic of RSET and benchmark design. Three RSET rods (stations) are installed, with one rod serving as the primary control point (PCP) for each site. See Vertical Control of Rod Surface Elevation Table (RSET) Benchmarks to Assess Implications of Sea-Level Rise within Texas Coastal Refuges for more information.
Sources/Usage
Public Domain.