C1 East Transect – 2014
Detailed Description
Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Fragments of drift seaweed and eelgrass are seen throughout entire video. Woody debris is present (0:29, 1:22 seconds). Invertebrates are scarce and are almost exclusively the ornate tubeworm Diopatra ornata (appears as small clumps of seaweed, eelgrass and detritus (0:27, 1:32, 1:47 seconds).
Details
Sources/Usage
Public Domain.