D2 West Transect – 2014
Detailed Description
Permanent Site: D2 West Transect; Depth: 12.3 Meters (40.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is present (1:07 seconds). Seaweeds are absent. A variety of invertebrates were present but none were abundant this year. A moon snail (Euspira lewisii) is seen at 0:17 seconds (large, white ball shape).
Details
Sources/Usage
Public Domain.