Geologic interpretation of seismic data relocation Route 1, cut, Stations 34-52, Copper Mine Road area and northern portion of Ballard Estate in Topsfield, Mass.

January 1, 1950

Relocation of the Newburyport Turnpike, Route 1, in Topsfield, Mass., will require a long relatively deep cut between stations 34 and 52. In order to obtain preliminary information on the depths to bedrock and on the nature of the subsurface materials at this site, reconnaissance seismic work was performed in October 1949. Because this reconnaissance work indicated that bedrock might be relatively near the surface over an extensive area where cuttings were to be made, a more detailed seismic study of the area was made in November 1949. The results of both the reconnaissance and detailed seismic work are included in this report. The work was done as part of a cooperative program of the Massachusetts Department of Public Works and the U.S. Geological Survey.

Publication Year 1950
Title Geologic interpretation of seismic data relocation Route 1, cut, Stations 34-52, Copper Mine Road area and northern portion of Ballard Estate in Topsfield, Mass.
DOI 10.3133/ofr5046B
Authors James E. May, Rev. Daniel Linehan
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 50-46
Index ID ofr5046B