Skip to main content
U.S. flag

An official website of the United States government

Geologic interpretation of seismic data relocation route 1: proposed cut at stations 127-135 in Danvers, Mass.

January 1, 1950

The layout for the reconstruction of the Newburyport Turnpike (Route 1) proposed cit at stations 127-135, in Danvers, Mass., shows a deep cut through the western end of a hill between stations 127 and 135. Because of the depth of this cut seismic work was done at the site in September 1949. The work constitutes part of the cooperative program of the Department of Public Works and the United States Geological Survey.

Publication Year 1950
Title Geologic interpretation of seismic data relocation route 1: proposed cut at stations 127-135 in Danvers, Mass.
DOI 10.3133/ofr5043B
Authors James E. May, Rev. Daniel Linehan
Publication Type Report
Publication Subtype USGS Numbered Series
Series Title Open-File Report
Series Number 50-43
Index ID ofr5043B
Record Source USGS Publications Warehouse