Hydrologic, biogeochemical, and radon data collected within and adjacent to the Little Wind River near Riverton, Wyoming
September 10, 2019
The U.S. Geological Survey is studying the interaction of a contaminated groundwater plume enriched in uranium and other trace elements with water, sediment, and biota along a 3 km reach of the Little Wind River in central Wyoming. The source of the contaminants is from a reclaimed uranium mill site near Riverton, Wyoming. The study is being done in collaboration with the Department of Energy, University of Montana, Northern Arapaho Tribe, and Liverpool John Moores University. This Data Release makes available data collected from June to September, 2016. Data collected during 2016 include: (1) radon, major ion, and trace element concentrations in surface-water, groundwater, and pore-water samples; (2) environmental tracers in groundwater and surface-water samples; (3) seepage rates of shallow groundwater into the Little Wind River; (4) streambed temperature; (5) microbial population composition in streambed biofilms; (6) distribution of uranium in bed sediment, macroalgae, and aquatic insect taxa; and (7) river discharge at three sites along the study reach.
Citation Information
Publication Year | 2019 |
---|---|
Title | Hydrologic, biogeochemical, and radon data collected within and adjacent to the Little Wind River near Riverton, Wyoming |
DOI | 10.5066/F7BR8QX4 |
Authors | Martin Briggs, Christopher C Fuller, Robert L Runkel, John E Solder, David L Naftz |
Product Type | Data Release |
Record Source | USGS Asset Identifier Service (AIS) |
USGS Organization | Wyoming-Montana Water Science Center - Helena Office |
Rights | This work is marked with CC0 1.0 Universal |
Related
Interaction of a legacy groundwater contaminant plume with the Little Wind River from 2015 through 2017, Riverton Processing site, Wyoming
The Riverton Processing site was a uranium mill 4 kilometers southwest of Riverton, Wyoming, that prepared uranium ore for nuclear reactors and weapons from 1958 to 1963. The U.S. Department of Energy completed surface remediation of the uranium tailings in 1989; however, groundwater below and downgradient from the tailings site and nearby Little Wind River was not remediated. Beginning...
Authors
David L. Naftz, Christopher C. Fuller, Robert L. Runkel, John Solder, W. Payton Gardner, Neil Terry, Martin A. Briggs, Terry M. Short, Daniel J. Cain, William L Dam, Patrick A. Byrne, James R. Campbell
Related
Interaction of a legacy groundwater contaminant plume with the Little Wind River from 2015 through 2017, Riverton Processing site, Wyoming
The Riverton Processing site was a uranium mill 4 kilometers southwest of Riverton, Wyoming, that prepared uranium ore for nuclear reactors and weapons from 1958 to 1963. The U.S. Department of Energy completed surface remediation of the uranium tailings in 1989; however, groundwater below and downgradient from the tailings site and nearby Little Wind River was not remediated. Beginning...
Authors
David L. Naftz, Christopher C. Fuller, Robert L. Runkel, John Solder, W. Payton Gardner, Neil Terry, Martin A. Briggs, Terry M. Short, Daniel J. Cain, William L Dam, Patrick A. Byrne, James R. Campbell