The panel of speakers at the PECORA I conference.
Images
Images intro.
The panel of speakers at the PECORA I conference.
![Don Orr speaking at Pecora I in 1975](https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/styles/masonry/public/thumbnails/image/October-28-1975-Don-Orr-Speaking-During-PECORA-I-Conference.jpg?itok=iaFnAuRd)
Don Orr speaking during the PECORA I conference.
Don Orr speaking during the PECORA I conference.
EROSPHERE displayed at the first PECORA convention.
EROSPHERE displayed at the first PECORA convention.
Mrs. Pecora Speaking at the first PECORA convention.
Mrs. Pecora Speaking at the first PECORA convention.
EROS Data Center tour during the PECORA I conference.
EROS Data Center tour during the PECORA I conference.
The front entrance doors of the EROS Data Center covered in frost during January blizzard.
The front entrance doors of the EROS Data Center covered in frost during January blizzard.
Moving snow at the EROS Data Center after January blizzard.
Moving snow at the EROS Data Center after January blizzard.
Glenn Landis, the first Acting Chief of the EROS Data Center. Subsequently became the long-term Deputy Chief.
Glenn Landis, the first Acting Chief of the EROS Data Center. Subsequently became the long-term Deputy Chief.
An overview of Landsat 1 and 2
Representative film holdings in the EROS Data Center archive.
Representative film holdings in the EROS Data Center archive.
The photo lab at the EROS Data Center produced film prints of aerial photography and satellite images for global science applications.
The photo lab at the EROS Data Center produced film prints of aerial photography and satellite images for global science applications.
Photo lab turnstiles leading to photographic dark rooms.
Photo lab turnstiles leading to photographic dark rooms.
1974 - Hawaii Nasa Mosaic Aircraft (E-329-810BN). EROS History Project
1974 - Hawaii Nasa Mosaic Aircraft (E-329-810BN). EROS History Project
1974 - New processing equipment installed in the Mundt building in early 1974. EROS History Project
1974 - New processing equipment installed in the Mundt building in early 1974. EROS History Project
1974 - Al Watkins, the first permanent USGS EROS Data Center Chief. EROS History Project
1974 - Al Watkins, the first permanent USGS EROS Data Center Chief. EROS History Project
![Photo of first large data processing system at USGS EROS, designed to process and archive EROS holdings](https://d9-wret.s3.us-west-2.amazonaws.com/assets/palladium/production/s3fs-public/styles/masonry/public/thumbnails/image/1974-Burroughs-Line-Printer-IBM-2407-Tape-Drives.jpg?itok=FzipZF2e)
1974 - First large data processing system, designed to process and archive EROS Data Center holdings. EROS History Project
1974 - First large data processing system, designed to process and archive EROS Data Center holdings. EROS History Project
EROS chemical mix room in downtown Sioux Falls, circa 1974. EROS History Project
EROS chemical mix room in downtown Sioux Falls, circa 1974. EROS History Project