This webinar is a part of the Climate Change Science and Management Webinar Series, co-hosted by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.
Videos
See our science in action.
This webinar is a part of the Climate Change Science and Management Webinar Series, co-hosted by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.
This webinar, "Application of High Resolution Climate Models to Benefit Avian Conservation in the Prairie Pothole Region, Northern Great Plains", was conducted by Susan Skagen and John Stamm as a part of the Climate Change Science and Management Webinar Series.
This webinar, "Application of High Resolution Climate Models to Benefit Avian Conservation in the Prairie Pothole Region, Northern Great Plains", was conducted by Susan Skagen and John Stamm as a part of the Climate Change Science and Management Webinar Series.
This webinar, ""Predicted Climate Change Effects on Fisheries Habitat and Production in the Great Lakes" was presented by David "Bo" Bunnell as a part of the USGS National Climate Change and Wildlife Science Center's Climate Change Science and Management Webinar Series.
This webinar, ""Predicted Climate Change Effects on Fisheries Habitat and Production in the Great Lakes" was presented by David "Bo" Bunnell as a part of the USGS National Climate Change and Wildlife Science Center's Climate Change Science and Management Webinar Series.
Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).
Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).
The U.S. Geological Survey Great Lakes Science Center has conducted lake-wide surveys of the fish community in Lake Michigan each fall since 1973 using standard 12-m bottom trawls towed along contour at depths of 9 to 110 m at seven different sites around the perimeter of the lake.
The U.S. Geological Survey Great Lakes Science Center has conducted lake-wide surveys of the fish community in Lake Michigan each fall since 1973 using standard 12-m bottom trawls towed along contour at depths of 9 to 110 m at seven different sites around the perimeter of the lake.
Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).
Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).
Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).
Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).
Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.
Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.
Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.
Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.
Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).
Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).
Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.
Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.
Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.
Permanent Site: J1 West Transect; Depth: 9.3 Meters (30.5 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.
Permanent Site: J1 West Transect; Depth: 9.3 Meters (30.5 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.
Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.
Permanent Control Site: GP2 West Transect; Depth: 12.3 Meters (40.4 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP2 West Transect; Depth: 12.3 Meters (40.4 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.
Permanent Control Site: GP1 West Transect; Depth: 7.7 Meters (25.3 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.
Permanent Control Site: GP1 West Transect; Depth: 7.7 Meters (25.3 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.