Skip to main content
U.S. flag

An official website of the United States government

Videos

Search here for some of our available videos.

Filter Total Items: 243
K1 West Transect – 2016
K1 West Transect – 2016
K1 West Transect – 2016

Permanent Site: K1 West Transect; Depth: 5.6 Meters (18.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 West Transect; Depth: 5.6 Meters (18.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

A2 East Transect – 2016
A2 East Transect – 2016
A2 East Transect – 2016

Permanent Site: A2 East Transect; Depth: 12.6 Meters (41.5 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.

Permanent Site: A2 East Transect; Depth: 12.6 Meters (41.5 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.

J1 East Transect – 2016
J1 East Transect – 2016
J1 East Transect – 2016

Permanent Site: J1 East Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture.

Permanent Site: J1 East Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture.

F2 East Transect – 2016
F2 East Transect – 2016
F2 East Transect – 2016

Permanent Site: F2 East Transect; Depth: 11.3 Meters (37.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder.

Permanent Site: F2 East Transect; Depth: 11.3 Meters (37.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder.

F2 West Transect – 2016
F2 West Transect – 2016
F2 West Transect – 2016

Permanent Site: F2 West Transect; Depth: 11.3 Meters (37.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder.

Permanent Site: F2 West Transect; Depth: 11.3 Meters (37.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder.

F1 East Transect – 2016
F1 East Transect – 2016
F1 East Transect – 2016

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.6 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: Visibility on the day this video was taken was bad and the currents were swift. This is a shallow site. Substrate is all sand.

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.6 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: Visibility on the day this video was taken was bad and the currents were swift. This is a shallow site. Substrate is all sand.

F1 West Transect – 2016
F1 West Transect – 2016
F1 West Transect – 2016

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: Visibility on the day this video was taken was bad and the currents were swift. This is a shallow site. Substrate is all sand.

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: Visibility on the day this video was taken was bad and the currents were swift. This is a shallow site. Substrate is all sand.

L1 East Transect – 2016
L1 East Transect – 2016
L1 East Transect – 2016

Permanent Site: L1 East Transect; Depth: 11.4 Meters (37.4 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:39 seconds).

Permanent Site: L1 East Transect; Depth: 11.4 Meters (37.4 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:39 seconds).

D2 East Transect – 2016
D2 East Transect – 2016
D2 East Transect – 2016

Permanent Site: D2 East Transect; Depth: 11.9 Meters (38.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river and is actively being buried in sandy substrate.

Permanent Site: D2 East Transect; Depth: 11.9 Meters (38.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river and is actively being buried in sandy substrate.

K1 West Transect – 2015
K1 West Transect – 2015
K1 West Transect – 2015

Permanent Site: K1 West Transect; Depth: 6.0 Meters (19.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 West Transect; Depth: 6.0 Meters (19.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

A2 East Transect – 2015
A2 East Transect – 2015
A2 East Transect – 2015

Permanent Site: A2 East Transect; Depth: 12.4 Meters (Feet 40.8); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.

Permanent Site: A2 East Transect; Depth: 12.4 Meters (Feet 40.8); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud.

A2 West Transect – 2015
A2 West Transect – 2015
A2 West Transect – 2015

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with a few scattered boulders.

F2 West Transect – 2015
F2 West Transect – 2015
F2 West Transect – 2015

Permanent Site: F2 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Visibility is poor on video due to a large amount of surge on the day of the dive.

Permanent Site: F2 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Visibility is poor on video due to a large amount of surge on the day of the dive.

4SP1 West Transect – 2015
4SP1 West Transect – 2015
4SP1 West Transect – 2015

Permanent Site: 4SP1 - West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

Permanent Site: 4SP1 - West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

L1 East Transect – 2015
L1 East Transect – 2015
L1 East Transect – 2015

Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).

Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).

L1 West Transect – 2015
L1 West Transect – 2015
L1 West Transect – 2015

Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

A1 East Transect – 2015
A1 East Transect – 2015
A1 East Transect – 2015

Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

K1 East Transect – 2015
K1 East Transect – 2015
K1 East Transect – 2015

Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

A1 West Transect – 2015
A1 West Transect – 2015
A1 West Transect – 2015

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.

C2 East Transect – 2015
C2 East Transect – 2015
C2 East Transect – 2015

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).

C2 West Transect – 2015
C2 West Transect – 2015
C2 West Transect – 2015

Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).

Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).