Skip to main content
U.S. flag

An official website of the United States government

Videos

Search here for some of our available videos.

Filter Total Items: 243
H1 East Transect – 2014
H1 East Transect – 2014
H1 East Transect – 2014

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

L1 East Transect – 2012
L1 East Transect – 2012
L1 East Transect – 2012

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

L1 West Transect – 2012
L1 West Transect – 2012
L1 West Transect – 2012

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

K1 East Transect – 2012
K1 East Transect – 2012
K1 East Transect – 2012

Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th

Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th

K1 West Transect – 2012
K1 West Transect – 2012
K1 West Transect – 2012

Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

H2 West Transect – 2012
H2 West Transect – 2012
H2 West Transect – 2012

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

D2 East Transect – 2012
D2 East Transect – 2012
D2 East Transect – 2012

Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

4SP1 West Transect – 2012
4SP1 West Transect – 2012
4SP1 West Transect – 2012

Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.

Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.

J1 East Transect – 2012
J1 East Transect – 2012
J1 East Transect – 2012

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

J1 West Transect – 2012
J1 West Transect – 2012
J1 West Transect – 2012

Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

GP1 East Transect – 2012
GP1 East Transect – 2012
GP1 East Transect – 2012

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2012
GP1 West Transect – 2012
GP1 West Transect – 2012

Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2012
GP2 East Transect – 2012
GP2 East Transect – 2012

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

GP2 West Transect – 2012
GP2 West Transect – 2012
GP2 West Transect – 2012

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

E2 East Transect – 2012
E2 East Transect – 2012
E2 East Transect – 2012

Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.

Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.

E2 West Transect – 2012
E2 West Transect – 2012
E2 West Transect – 2012

Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

H2 East Transect – 2012
H2 East Transect – 2012
H2 East Transect – 2012

Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

F2 East Transect – 2012
F2 East Transect – 2012
F2 East Transect – 2012

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

F2 West Transect – 2012
F2 West Transect – 2012
F2 West Transect – 2012

Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

A2 East Transect – 2012
A2 East Transect – 2012
A2 East Transect – 2012

Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.

Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.

C1 East Transect – 2012
C1 East Transect – 2012
C1 East Transect – 2012

Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).

Permanent Site: C1 East Transect; Depth: 8.8 Meters (Feet 28.8); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Brown seaweeds are absent and only a few small red seaweeds remain (1:13, 2:31 seconds).