Skip to main content
U.S. flag

An official website of the United States government

Videos

Search here for some of our available videos.

Filter Total Items: 243
H1 East Transect – 2015
H1 East Transect – 2015
H1 East Transect – 2015

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2015
H1 West Transect – 2015
H1 West Transect – 2015

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

GP2 West Transect – 2016
GP2 West Transect – 2016
GP2 West Transect – 2016

Permanent Control Site: GP2 West Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

GP1 East Transect – 2015
GP1 East Transect – 2015
GP1 East Transect – 2015

Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2015
GP1 West Transect – 2015
GP1 West Transect – 2015

Permanent Control Site: GP1 West Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2015
GP2 East Transect – 2015
GP2 East Transect – 2015

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

D2 East Transect – 2015
D2 East Transect – 2015
D2 East Transect – 2015

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel.

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel.

D2 West Transect – 2015
D2 West Transect – 2015
D2 West Transect – 2015

Permanent Site: D2 West Transect; Depth: 12.7 Meters (41.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel and cobble.

Permanent Site: D2 West Transect; Depth: 12.7 Meters (41.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel and cobble.

J1 East Transect – 2015
J1 East Transect – 2015
J1 East Transect – 2015

Permanent Site: J1 East Transect; Depth: 9.4 Meters (30.8 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density has increased.

Permanent Site: J1 East Transect; Depth: 9.4 Meters (30.8 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density has increased.

J1 West Transect – 2015
J1 West Transect – 2015
J1 West Transect – 2015

Permanent Site: J1 West Transect; Depth: 9.2 Meters (30.2 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: Visibility was bad on this date and video is of poor quality. This site is medium depth.

Permanent Site: J1 West Transect; Depth: 9.2 Meters (30.2 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: Visibility was bad on this date and video is of poor quality. This site is medium depth.

4SP1 East Transect – 2015
4SP1 East Transect – 2015
4SP1 East Transect – 2015

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (17.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (17.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

F1 East Transect – 2015 - YouTube
F1 East Transect – 2015 - YouTube
F1 East Transect – 2015 - YouTube

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site. Substrate is still mainly sand but some cobble is present (2:15, 2:27 seconds).

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site. Substrate is still mainly sand but some cobble is present (2:15, 2:27 seconds).

F1 West Transect – 2015
F1 West Transect – 2015
F1 West Transect – 2015

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: The video is of poor quality. This is a shallow site. Substrate is still mainly sand with an occasional cobble.

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: The video is of poor quality. This is a shallow site. Substrate is still mainly sand with an occasional cobble.

H2 East Transect – 2015
H2 East Transect – 2015
H2 East Transect – 2015

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.7 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.7 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

H2 West Transect – 2015
H2 West Transect – 2015
H2 West Transect – 2015

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.2 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.2 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

E2 East Transect – 2015
E2 East Transect – 2015
E2 East Transect – 2015

Permanent Site: E2 East Transect; Depth: 14.8 Meters (48.5 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder.

Permanent Site: E2 East Transect; Depth: 14.8 Meters (48.5 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder.

E2 West Transect – 2015
E2 West Transect – 2015
E2 West Transect – 2015

Permanent Site: E2 West Transect; Depth: 14.8 Meters (48.7 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 14.8 Meters (48.7 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

C1 East Transect – 2015
C1 East Transect – 2015
C1 East Transect – 2015

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (1:36, 2:20 seconds).

Permanent Site: C1 East Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (1:36, 2:20 seconds).

C1 West Transect – 2015
C1 West Transect – 2015
C1 West Transect – 2015

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:06 seconds).

Permanent Site: C1 West Transect; Depth: Meters (Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. All seaweeds are absent. Woody debris is present (0:06 seconds).

Drano Lake Sockeye Salmon
Drano Lake Sockeye Salmon
Drano Lake Sockeye Salmon

Adult Sockeye Salmon in Drano Lake, WA on July 15th and 16th 2015.

F2 East Transect – 2014
F2 East Transect – 2014
F2 East Transect – 2014

Permanent Site: F2 East Transect; Depth: 11.9 Meters (39.1 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder. Some seaweed has returned.

Permanent Site: F2 East Transect; Depth: 11.9 Meters (39.1 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly a gravel - cobble mixture with an occasional boulder. Some seaweed has returned.