Skip to main content
U.S. flag

An official website of the United States government

Videos

The USGS is a science organization that provides impartial information on the health of our ecosystems and environment, the natural hazards that threaten us, the natural resources we rely on, the impacts of climate and land-use change, and the core science systems that help us provide timely, relevant, and useable information.

Filter Total Items: 2858
R/V Arcticus Content Page

A longer video of the beginning of construction. This video does not have audio associated with it.

A longer video of the beginning of construction. This video does not have audio associated with it.

R/V Arcticus Home Page

A 5-second over for our home page. No Audio is associated with this video

A 5-second over for our home page. No Audio is associated with this video

Animal Interactions at Wind Energy Facilities – Gray Fox
Animal Interactions at Wind Energy Facilities – Gray Fox
Animal Interactions at Wind Energy Facilities – Gray Fox

There were two documented gray fox visits at the burrows, making them the third most documented predator. Gray foxes are implicated predators of various life stages of desert tortoises, but it is difficult to catch them in the act. In this case, a gray fox approaches a burrow, and thoroughly investigates the burrow mouth.

There were two documented gray fox visits at the burrows, making them the third most documented predator. Gray foxes are implicated predators of various life stages of desert tortoises, but it is difficult to catch them in the act. In this case, a gray fox approaches a burrow, and thoroughly investigates the burrow mouth.

Animal Interactions at Wind Energy Facilities – Western Spotted Skunk
Animal Interactions at Wind Energy Facilities – Western Spotted Skunk
Animal Interactions at Wind Energy Facilities – Western Spotted Skunk

There was one documented skunk event captured on camera - the least documented predator. Here, a western spotted skunk is thoroughly investigating the burrow of one of the marked female tortoises in the study population. Western spotted skunks are known predators of turtle eggs.

There was one documented skunk event captured on camera - the least documented predator. Here, a western spotted skunk is thoroughly investigating the burrow of one of the marked female tortoises in the study population. Western spotted skunks are known predators of turtle eggs.

F2 East Transect – 2013
F2 East Transect – 2013
F2 East Transect – 2013

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).

ScienceBase and Other Project Lifecycle Tools

This video is a part of the Climate Change Science and Management Webinar Series, hosted by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.

This video is a part of the Climate Change Science and Management Webinar Series, hosted by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.

Phenology

Leaves changing colors outside of Reston Town Center.

Leaves changing colors outside of Reston Town Center.

USGS Science in Maine - Great Works Dam Removal

In this video we briefly discuss the removal of the Great Works Dam on the Penobscot River in Maine. We also highlight some work the USGS is doing to document river conditions before and after dam removal.

In this video we briefly discuss the removal of the Great Works Dam on the Penobscot River in Maine. We also highlight some work the USGS is doing to document river conditions before and after dam removal.

L1 East Transect – 2013
L1 East Transect – 2013
L1 East Transect – 2013

Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).

Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).

L1 West Transect – 2013
L1 West Transect – 2013
L1 West Transect – 2013

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).

H2 East Transect – 2013
H2 East Transect – 2013
H2 East Transect – 2013

Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

H2 West Transect – 2013
H2 West Transect – 2013
H2 West Transect – 2013

Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

GP1 East Transect – 2013
GP1 East Transect – 2013
GP1 East Transect – 2013

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2013
GP2 East Transect – 2013
GP2 East Transect – 2013

Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Water-level Change in the High Plains Aquifer System
Water-level Change in the High Plains Aquifer System
Water-level Change in the High Plains Aquifer System

In 1986, Congress directed the USGS to regularly report groundwater-level changes in the High Plains aquifer system. To comply with this directive, the USGS compares water levels measured every two years. By measuring water levels across the entire aquifer in one year, measurements made two years later enable calculation of changes over time.

In 1986, Congress directed the USGS to regularly report groundwater-level changes in the High Plains aquifer system. To comply with this directive, the USGS compares water levels measured every two years. By measuring water levels across the entire aquifer in one year, measurements made two years later enable calculation of changes over time.

A2 West Transect – 2013
A2 West Transect – 2013
A2 West Transect – 2013

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

D2 East Transect – 2013
D2 East Transect – 2013
D2 East Transect – 2013

Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.

Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.

D2 West Transect – 2013
D2 West Transect – 2013
D2 West Transect – 2013

Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).

Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).

H1 East Transect – 2013
H1 East Transect – 2013
H1 East Transect – 2013

Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2013
H1 West Transect – 2013
H1 West Transect – 2013

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

J1 East Transect – 2013
J1 East Transect – 2013
J1 East Transect – 2013

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

Was this page helpful?