The sun begins to set through the trees within the Outer Banks, South Carolina (November 2011).
Images
Images
The sun begins to set through the trees within the Outer Banks, South Carolina (November 2011).
Picture of the Outer Banks in late fall (South Carolina, 2011)
Picture of the Outer Banks in late fall (South Carolina, 2011)
Picture of the Outer Banks in late fall (South Carolina, 2011)
Picture of the Outer Banks in late fall (South Carolina, 2011)
A rainbow over the USGS streamflow station gage house at the outlet of Bass Harbor Marsh in Maine (monitoring location 010228955).
A rainbow over the USGS streamflow station gage house at the outlet of Bass Harbor Marsh in Maine (monitoring location 010228955).
On October 6, 2011 USGS staff were visiting their streamflow station at the outlet of Bass Harbor Marsh and snapped this photo of a rainbow over the gage house.
On October 6, 2011 USGS staff were visiting their streamflow station at the outlet of Bass Harbor Marsh and snapped this photo of a rainbow over the gage house.
Access to Harlem River from parks such as Mill Pond, Bronx, NY is blocked by infrastructure like railways or bulkheads along most of its banks
Access to Harlem River from parks such as Mill Pond, Bronx, NY is blocked by infrastructure like railways or bulkheads along most of its banks
Flood damage from tropical storm Irene, August 28, 2011, washed out Maxam Road bridge on the West Branch North River in Colrain, Massachusetts.
Flood damage from tropical storm Irene, August 28, 2011, washed out Maxam Road bridge on the West Branch North River in Colrain, Massachusetts.
Steaming to the deployment site south of Martha's Vineyard, MA in 2011. The platform shown was specially adapted so the arm cycles up and down through the Benthic Boubdary Layer while deployed on the seafloor. For more information see https://soundwaves.usgs.gov/2011/11/fieldwork2.html.
Steaming to the deployment site south of Martha's Vineyard, MA in 2011. The platform shown was specially adapted so the arm cycles up and down through the Benthic Boubdary Layer while deployed on the seafloor. For more information see https://soundwaves.usgs.gov/2011/11/fieldwork2.html.
Nice photo-op of Healy with a striking background.
Nice photo-op of Healy with a striking background.
Ice conditions in the Arctic from CCGS Louis S. St-Laurent.
Ice conditions in the Arctic from CCGS Louis S. St-Laurent.
It is very unusual for large (400 ft) vessels to be so close together during normal science operations. In this case, the skilled ship handling of the Captain from USCGC Healy enabled Healy to back within ~75 ft of Louis to clear ice around the bow of Louis, thereby releasing pressure and allowing her to move again.
It is very unusual for large (400 ft) vessels to be so close together during normal science operations. In this case, the skilled ship handling of the Captain from USCGC Healy enabled Healy to back within ~75 ft of Louis to clear ice around the bow of Louis, thereby releasing pressure and allowing her to move again.
A debris line was left on the ground where the river reached its peak at USGS station ID 010642505 Saco River at Bartlett, New Hampshire. This is a type of High-Water Mark that was flagged for an indirect measurement of discharge.
A debris line was left on the ground where the river reached its peak at USGS station ID 010642505 Saco River at Bartlett, New Hampshire. This is a type of High-Water Mark that was flagged for an indirect measurement of discharge.
USGS staffer in Susquehanna River floodwaters in Owego, NY 2011
USGS staffer in Susquehanna River floodwaters in Owego, NY 2011
USGS scientists test the moving arm bottom platform at the Woods Hole Oceanographic Institution (WHOI) dock. While it was deployed, the system moved sensors through the bottom boundary layer and transmitted data in real time to shore via WHOI's Martha's Vineyard coastal observatory.
USGS scientists test the moving arm bottom platform at the Woods Hole Oceanographic Institution (WHOI) dock. While it was deployed, the system moved sensors through the bottom boundary layer and transmitted data in real time to shore via WHOI's Martha's Vineyard coastal observatory.
USGS scientists assembling a novel profiling arm to measure suspended sediment in the benthic boundary layer. This large seafloor platform was later deployed for several months off Martha's Vineyard, MA as part of the Optics Acoustics and Stress In Situ (OASIS) Project in 2011.
USGS scientists assembling a novel profiling arm to measure suspended sediment in the benthic boundary layer. This large seafloor platform was later deployed for several months off Martha's Vineyard, MA as part of the Optics Acoustics and Stress In Situ (OASIS) Project in 2011.
Nice photo-opportunity of USGS working near the North Pole!
Nice photo-opportunity of USGS working near the North Pole!
The channel at Roaring Brook needed reconstruction after Irene devastated the river system due to the immense rainfall. This image was taken looking upstream from Route 7 (North St) crossing in Bennington, Vermont.
The channel at Roaring Brook needed reconstruction after Irene devastated the river system due to the immense rainfall. This image was taken looking upstream from Route 7 (North St) crossing in Bennington, Vermont.
Damage to bridge at E. Kill nr Jewett from Tropical Storm Irene
Damage to bridge at E. Kill nr Jewett from Tropical Storm Irene
Before Irene reached New England, the USGS New England Water Science Center had to make sure our boats were running properly in anticipation of making discharge measurements in the larger rivers. In some cases, we had to get permission ahead of time to use boat ramps that were closed to the public.
Before Irene reached New England, the USGS New England Water Science Center had to make sure our boats were running properly in anticipation of making discharge measurements in the larger rivers. In some cases, we had to get permission ahead of time to use boat ramps that were closed to the public.
USCG Healy is circling to pass CCGS Louis in order to break her free from the ice. The joint field program utilized two icebreakers so that the seismic vessel, with gear in the water behind the ship, could be broken free when the ice prevented her forward progress.
USCG Healy is circling to pass CCGS Louis in order to break her free from the ice. The joint field program utilized two icebreakers so that the seismic vessel, with gear in the water behind the ship, could be broken free when the ice prevented her forward progress.
Deploying the airgun array from CCGS Louis S. St-Laurent. USCGC Healy can be seen in the background.
Deploying the airgun array from CCGS Louis S. St-Laurent. USCGC Healy can be seen in the background.