Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore videos.

Filter Total Items: 320
Turbid Water in Fall Creek
Turbid Water in Fall Creek
Turbid Water in Fall Creek

Muddy, or turbid water, caused by suspended-sediment released during Fall Creek Reservoir draw down. Reservoir was drawn down to purge sediment and trapped fish from behind dam in December 2012.

Muddy, or turbid water, caused by suspended-sediment released during Fall Creek Reservoir draw down. Reservoir was drawn down to purge sediment and trapped fish from behind dam in December 2012.

Climate Change Threats to Estuaries in the Pacific Northwest

This presentation is a part of the ‘NCCWSC Climate Change Science and Management Webinar Series‘, developed in partnership by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.

This presentation is a part of the ‘NCCWSC Climate Change Science and Management Webinar Series‘, developed in partnership by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center.

L1 East Transect – 2012
L1 East Transect – 2012
L1 East Transect – 2012

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

L1 West Transect – 2012
L1 West Transect – 2012
L1 West Transect – 2012

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.6 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

K1 East Transect – 2012
K1 East Transect – 2012
K1 East Transect – 2012

Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th

Permanent Site: K1 East Transect; Depth: 6.5 Meters (21.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive th

K1 West Transect – 2012
K1 West Transect – 2012
K1 West Transect – 2012

Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

Permanent Site: K1 West Transect; Depth: 6.1 Meters (19.9 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

H2 West Transect – 2012
H2 West Transect – 2012
H2 West Transect – 2012

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.7 Meters (25.1 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

D2 East Transect – 2012
D2 East Transect – 2012
D2 East Transect – 2012

Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

Permanent Site: D2 East Transect; Depth: 12.0 Meters (39.5 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand.

4SP1 West Transect – 2012
4SP1 West Transect – 2012
4SP1 West Transect – 2012

Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.

Permanent Site: 4SP1 - West Transect; Depth: 6.3 Meters (20.8 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 11 months post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: Substrate has remained the same (gravel/cobble) but site is largely devoid of all annual species of seaweeds.

J1 East Transect – 2012
J1 East Transect – 2012
J1 East Transect – 2012

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This permanent transect was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive t

J1 West Transect – 2012
J1 West Transect – 2012
J1 West Transect – 2012

Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

Permanent Site: J1 West Transect; Depth: 9.1 Meters (29.9 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This permanent site was only established post dam-removal after it was discovered that the degree of seaweed loss was more extensive than

GP1 East Transect – 2012
GP1 East Transect – 2012
GP1 East Transect – 2012

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.6 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2012
GP1 West Transect – 2012
GP1 West Transect – 2012

Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.6 Meters (24.9 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2012
GP2 East Transect – 2012
GP2 East Transect – 2012

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

GP2 West Transect – 2012
GP2 West Transect – 2012
GP2 West Transect – 2012

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.8 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

E2 East Transect – 2012
E2 East Transect – 2012
E2 East Transect – 2012

Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.

Permanent Site: E2 East Transect; Depth: 14.7 Meters (48.2 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Video was not available in 2011 for this site pre-dam removal.

E2 West Transect – 2012
E2 West Transect – 2012
E2 West Transect – 2012

Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 15.0 Meters (49.1 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

H2 East Transect – 2012
H2 East Transect – 2012
H2 East Transect – 2012

Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 7.9 Meters (26.0 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

F2 East Transect – 2012
F2 East Transect – 2012
F2 East Transect – 2012

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

F2 West Transect – 2012
F2 West Transect – 2012
F2 West Transect – 2012

Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

Permanent Site: F2 West Transect; Depth: 11.6 Meters (38.2 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly gravel mixed with a little cobble and an occasional boulder.

A2 East Transect – 2012
A2 East Transect – 2012
A2 East Transect – 2012

Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.

Permanent Site: A2 East Transect; Depth: 12.9 Meters (Feet 42.4); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 10 months post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Annual seaweeds are present but very sparse.