Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore videos.

Filter Total Items: 320
K1 East Transect – 2014 - YouTube
K1 East Transect – 2014 - YouTube
K1 East Transect – 2014 - YouTube

Permanent Site: K1 East Transect; Depth: 6.6 Meters (21.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: Visibility and surge was bad on this date so video is of poor quality. This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 East Transect; Depth: 6.6 Meters (21.8 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: Visibility and surge was bad on this date so video is of poor quality. This is a shallow site. Sediment is a gravel/sand mixture.

L1 East Transect – 2014
L1 East Transect – 2014
L1 East Transect – 2014

Permanent Site: L1 East Transect; Depth: 11.3 Meters (37.1 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is still mainly fine sediment/sand/mud with a few scattered boulders.

Permanent Site: L1 East Transect; Depth: 11.3 Meters (37.1 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is still mainly fine sediment/sand/mud with a few scattered boulders.

L1 West Transect – 2014
L1 West Transect – 2014
L1 West Transect – 2014

Permanent Site: L1 West Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

Permanent Site: L1 West Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 3 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

Water Temp Modeling Animation: Middle Fork Willamette River Reservoirs
Water Temp Modeling Animation: Middle Fork Willamette River Reservoirs
Water Temp Modeling Animation: Middle Fork Willamette River Reservoirs

CE-QUAL-W2 temperature model animation of Hills Creek, Lookout Point, and Dexter Reservoirs on the Middle Fork Willamette River. Data are modeled for calendar year 2011. For supporting information, see http://pubs.usgs.gov/of/2013/1186/.

CE-QUAL-W2 temperature model animation of Hills Creek, Lookout Point, and Dexter Reservoirs on the Middle Fork Willamette River. Data are modeled for calendar year 2011. For supporting information, see http://pubs.usgs.gov/of/2013/1186/.

Water Temp Modeling Animation: Middle Fork Willamette
Water Temp Modeling Animation: Middle Fork Willamette
Water Temp Modeling Animation: Middle Fork Willamette

CE-QUAL-W2 temperature model animation of Hills Creek, Lookout Point, and Dexter Lakes on the Middle Fork Willamette River.

CE-QUAL-W2 temperature model animation of Hills Creek, Lookout Point, and Dexter Lakes on the Middle Fork Willamette River.

F2 East Transect – 2013
F2 East Transect – 2013
F2 East Transect – 2013

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).

Permanent Site: F2 East Transect; Depth: 11.7 Meters (38.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15672004,-123.54969397; Site Description: This video was taken in September, about 40 days after the video on the west transect (F2 West Transect – 2013).

L1 East Transect – 2013
L1 East Transect – 2013
L1 East Transect – 2013

Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).

Permanent Site: L1 East Transect; Depth: 10.3 Meters (33.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is now mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:09 seconds).

L1 West Transect – 2013
L1 West Transect – 2013
L1 West Transect – 2013

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).

Permanent Site: L1 West Transect; Depth: 11.2 Meters (36.9 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:08 seconds).

H2 East Transect – 2013
H2 East Transect – 2013
H2 East Transect – 2013

Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 8.0 Meters (26.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

H2 West Transect – 2013
H2 West Transect – 2013
H2 West Transect – 2013

Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.4 Meters (24.3 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

GP1 East Transect – 2013
GP1 East Transect – 2013
GP1 East Transect – 2013

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.2 Meters (23.5 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2013
GP2 East Transect – 2013
GP2 East Transect – 2013

Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.0 Meters (42.8 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

D2 East Transect – 2013
D2 East Transect – 2013
D2 East Transect – 2013

Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.

Permanent Site: D2 East Transect; Depth: 11.8 Meters (38.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. No live seaweeds are present.

D2 West Transect – 2013
D2 West Transect – 2013
D2 West Transect – 2013

Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).

Permanent Site: D2 West Transect; Depth: 11.9 Meters (39.0 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some sand and cobble. Woody debris is seen (2:13 seconds).

A2 West Transect – 2013
A2 West Transect – 2013
A2 West Transect – 2013

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

Permanent Site: A2 West Transect; Depth: 12.9 Meters (Feet 42.3); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

J1 East Transect – 2013
J1 East Transect – 2013
J1 East Transect – 2013

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

Permanent Site: J1 East Transect; Depth: 9.1 Meters (30.0 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

J1 West Transect – 2013
J1 West Transect – 2013
J1 West Transect – 2013

Permanent Site: J1 West Transect; Depth: 9.3 Meters (30.5 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

Permanent Site: J1 West Transect; Depth: 9.3 Meters (30.5 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrates has remained mainly a gravel/sand mixture. Seaweed density is still greatly decreased.

H1 East Transect – 2013
H1 East Transect – 2013
H1 East Transect – 2013

Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.4 Meters (Feet 17.8); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2013
H1 West Transect – 2013
H1 West Transect – 2013

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.9 Meters (Feet 19.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

GP2 West Transect – 2013
GP2 West Transect – 2013
GP2 West Transect – 2013

Permanent Control Site: GP2 West Transect; Depth: 12.3 Meters (40.4 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.3 Meters (40.4 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

GP1 West Transect – 2013
GP1 West Transect – 2013
GP1 West Transect – 2013

Permanent Control Site: GP1 West Transect; Depth: 7.7 Meters (25.3 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.7 Meters (25.3 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 2 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.