Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore videos.

Filter Total Items: 320
L1 East Transect – 2015
L1 East Transect – 2015
L1 East Transect – 2015

Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).

Permanent Site: L1 East Transect; Depth: 11.6 Meters (38.0 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud with a few scattered boulders (1:15 seconds).

L1 West Transect – 2015
L1 West Transect – 2015
L1 West Transect – 2015

Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

Permanent Site: L1 West Transect; Depth: 11.4 Meters (37.3 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:18 seconds).

A1 East Transect – 2015
A1 East Transect – 2015
A1 East Transect – 2015

Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

Permanent Site: A1 East Transect; Depth: 8.3 Meters (27.1 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to be buried.

K1 East Transect – 2015
K1 East Transect – 2015
K1 East Transect – 2015

Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 East Transect; Depth: 6.7 Meters (22.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

A1 West Transect – 2015
A1 West Transect – 2015
A1 West Transect – 2015

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.5 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders. Seaweeds have returned.

C2 East Transect – 2015
C2 East Transect – 2015
C2 East Transect – 2015

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).

Permanent Site: C2 East Transect; Depth: 16.3 Meters (Feet 53.4); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Some woody debris is seen (0:39 seconds).

C2 West Transect – 2015
C2 West Transect – 2015
C2 West Transect – 2015

Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).

Permanent Site: C2 West Transect; Depth: 16.6 Meters (Feet 54.5); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Lots of woody debris is present (0:42, 0:44, 0:53 seconds).

H1 East Transect – 2015
H1 East Transect – 2015
H1 East Transect – 2015

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.5 Meters (Feet 18.2); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2015
H1 West Transect – 2015
H1 West Transect – 2015

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.7 Meters (Feet 18.6); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

GP2 West Transect – 2016
GP2 West Transect – 2016
GP2 West Transect – 2016

Permanent Control Site: GP2 West Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

GP1 East Transect – 2015
GP1 East Transect – 2015
GP1 East Transect – 2015

Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.3 Meters (24 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31538047; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2015
GP1 West Transect – 2015
GP1 West Transect – 2015

Permanent Control Site: GP1 West Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 8.0 Meters (26.1 Feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2015
GP2 East Transect – 2015
GP2 East Transect – 2015

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

D2 East Transect – 2015
D2 East Transect – 2015
D2 East Transect – 2015

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel.

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.8 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel.

D2 West Transect – 2015
D2 West Transect – 2015
D2 West Transect – 2015

Permanent Site: D2 West Transect; Depth: 12.7 Meters (41.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel and cobble.

Permanent Site: D2 West Transect; Depth: 12.7 Meters (41.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel and cobble.

J1 East Transect – 2015
J1 East Transect – 2015
J1 East Transect – 2015

Permanent Site: J1 East Transect; Depth: 9.4 Meters (30.8 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density has increased.

Permanent Site: J1 East Transect; Depth: 9.4 Meters (30.8 Feet); Distance from river mouth: 6.7 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.47935008; Site Description: This site is medium depth. Substrates is mainly a gravel/sand mixture. Seaweed density has increased.

J1 West Transect – 2015
J1 West Transect – 2015
J1 West Transect – 2015

Permanent Site: J1 West Transect; Depth: 9.2 Meters (30.2 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: Visibility was bad on this date and video is of poor quality. This site is medium depth.

Permanent Site: J1 West Transect; Depth: 9.2 Meters (30.2 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: Visibility was bad on this date and video is of poor quality. This site is medium depth.

4SP1 East Transect – 2015
4SP1 East Transect – 2015
4SP1 East Transect – 2015

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (17.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (17.9 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Seaweed is completely absent. 
 

F1 East Transect – 2015 - YouTube
F1 East Transect – 2015 - YouTube
F1 East Transect – 2015 - YouTube

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site. Substrate is still mainly sand but some cobble is present (2:15, 2:27 seconds).

Permanent Site: F1 East Transect; Depth: 6.3 Meters (20.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55011402; Site Description: This is a shallow site. Substrate is still mainly sand but some cobble is present (2:15, 2:27 seconds).

F1 West Transect – 2015
F1 West Transect – 2015
F1 West Transect – 2015

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: The video is of poor quality. This is a shallow site. Substrate is still mainly sand with an occasional cobble.

Permanent Site: F1 West Transect; Depth: 6.6 Meters (21.7 Feet); Distance from river mouth: 1.3 Kilometers (0.8 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15292999, -123.55078602; Site Description: The video is of poor quality. This is a shallow site. Substrate is still mainly sand with an occasional cobble.

H2 East Transect – 2015
H2 East Transect – 2015
H2 East Transect – 2015

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.7 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 8.1 Meters (26.7 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 4 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.