Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore videos.

Filter Total Items: 320
L1 East Transect – 2017
L1 East Transect – 2017
L1 East Transect – 2017

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:05 seconds).

Permanent Site: L1 East Transect; Depth: 11.0 Meters (36.2 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59359993; Site Description: This transect is medium depth. Substrate is mainly fine sediment/sand/mud covered in a layer of brown diatoms (0:05 seconds).

L1 West Transect – 2017
L1 West Transect – 2017
L1 West Transect – 2017

Permanent Site: L1 West Transect; Depth: 10.9 Meters (35.7 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:52, 1:12 seconds).

Permanent Site: L1 West Transect; Depth: 10.9 Meters (35.7 Feet); Distance from river mouth: 2.3 Kilometers (1.4 Miles) west; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13957527,-123.59427175; Site Description: This transect is medium depth. The first 20 meters contains scattered boulders (0:52, 1:12 seconds).

D2 East Transect – 2017
D2 East Transect – 2017
D2 East Transect – 2017

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river.

Permanent Site: D2 East Transect; Depth: 12.1 Meters (39.7 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15233001,-123.56829403; Site Description: This site is right off the mouth of the river.

D2 West Transect – 2017
D2 West Transect – 2017
D2 West Transect – 2017

Permanent Site: D2 West Transect; Depth: 12.3 Meters (40.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river.

Permanent Site: D2 West Transect; Depth: 12.3 Meters (40.3 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 6 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river.

Return of the Yellowstone Grizzly Bear
Return of the Yellowstone Grizzly Bear
Return of the Yellowstone Grizzly Bear

Yellowstone grizzly bears inhabit federal, state, tribal, and private lands, and long-term research requires careful coordination across governmental levels.

Yellowstone grizzly bears inhabit federal, state, tribal, and private lands, and long-term research requires careful coordination across governmental levels.

H1 East Transect – June 2017
H1 East Transect – June 2017
H1 East Transect – June 2017

Permanent Site: H1 East Transect; Depth: 5.4 Meters (17.6 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.4 Meters (17.6 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 East Transect – May 2017
H1 East Transect – May 2017
H1 East Transect – May 2017

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Anadromous Steelhead and resident Rainbow Trout interactions
Anadromous Steelhead and resident Rainbow Trout interactions
Anadromous Steelhead and resident Rainbow Trout interactions

This video captures both the resident and anadromous forms of (Oncorhyncus mykiss) Rainbow Trout in a small tributary in the upper Cowlitz River Basin, Washington during spawning season. The male Rainbow Trout exhibits a courting behavior as it quivers against the side of the larger female (HOR) hatchery origin steelhead.

This video captures both the resident and anadromous forms of (Oncorhyncus mykiss) Rainbow Trout in a small tributary in the upper Cowlitz River Basin, Washington during spawning season. The male Rainbow Trout exhibits a courting behavior as it quivers against the side of the larger female (HOR) hatchery origin steelhead.

H1 East Transect – April 2017
H1 East Transect – April 2017
H1 East Transect – April 2017

Permanent Site: H1 East Transect; Depth: 5.5 Meters (18.0 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.5 Meters (18.0 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Using a Continuous Flow Centrifuge to Collect Suspended Sediment
Using a Continuous Flow Centrifuge to Collect Suspended Sediment
Using a Continuous Flow Centrifuge to Collect Suspended Sediment

Kathy Conn, a U.S. Geological Survey Water Quality Specialist, demonstrates a new USGS field method using a continuous flow centrifuge to collect suspended sediment from large volumes of water in the Duwamish River near Seattle Washington.
 

Kathy Conn, a U.S. Geological Survey Water Quality Specialist, demonstrates a new USGS field method using a continuous flow centrifuge to collect suspended sediment from large volumes of water in the Duwamish River near Seattle Washington.
 

H1 East Transect – March 2017
H1 East Transect – March 2017
H1 East Transect – March 2017

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 East Transect – February 2017
H1 East Transect – February 2017
H1 East Transect – February 2017

Permanent Site: H1 East Transect; Depth: 5.8 Meters (19.1 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.8 Meters (19.1 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Framework for Evaluating Multi-Species Climate Change Vulnerability
Framework for Evaluating Multi-Species Climate Change Vulnerability
Framework for Evaluating Multi-Species Climate Change Vulnerability

This webinar was conducted as part of the Climate Change Science and Management Webinar series, hosted in partnership by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center. 

This webinar was conducted as part of the Climate Change Science and Management Webinar series, hosted in partnership by the USGS National Climate Change and Wildlife Science Center and the FWS National Conservation Training Center. 

E2 East Transect – 2016
E2 East Transect – 2016
E2 East Transect – 2016

Permanent Site: E2 East Transect; Depth: 14.3 Meters (46.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. A few brown acid kelps (Desmarestia spp.

Permanent Site: E2 East Transect; Depth: 14.3 Meters (46.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. A few brown acid kelps (Desmarestia spp.

E2 West Transect – 2016
E2 West Transect – 2016
E2 West Transect – 2016

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

J1 West Transect – 2016
J1 West Transect – 2016
J1 West Transect – 2016

Permanent Site: J1 West Transect; Depth: 9.8 Meters (32.3 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrate is mainly a gravel/sand mixture.

Permanent Site: J1 West Transect; Depth: 9.8 Meters (32.3 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrate is mainly a gravel/sand mixture.

D2 West Transect – 2016
D2 West Transect – 2016
D2 West Transect – 2016

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

GP2 West Transect – 2015
GP2 West Transect – 2015
GP2 West Transect – 2015

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

GP1 East Transect – 2016
GP1 East Transect – 2016
GP1 East Transect – 2016

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.