Skip to main content
U.S. flag

An official website of the United States government

Videos

Explore videos.

Filter Total Items: 320
C2 East Transect – 2017
C2 East Transect – 2017
C2 East Transect – 2017

Permanent Site: C2 East Transect; Depth: 15.1 Meters (49.7 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand.

Permanent Site: C2 East Transect; Depth: 15.1 Meters (49.7 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57596074; Site Description: One of our deepest sites. Substrate is all muddy sand.

C2 West Transect – 2017
C2 West Transect – 2017
C2 West Transect – 2017

Permanent Site: C2 West Transect; Depth: 15.3 Meters (50.3 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

Permanent Site: C2 West Transect; Depth: 15.3 Meters (50.3 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

4SP1 East Transect – 2017
4SP1 East Transect – 2017
4SP1 East Transect – 2017

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (18.1 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent.

Permanent Site: 4SP1 - East Transect; Depth: 5.5 Meters (18.1 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.556704; Site Description: The site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent.

4SP1 West Transect – 2017
4SP1 West Transect – 2017
4SP1 West Transect – 2017

Permanent Site: 4SP1 - West Transect; Depth: 6.2 Meters (20.2 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: This site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent.

Permanent Site: 4SP1 - West Transect; Depth: 6.2 Meters (20.2 Feet); Distance from river mouth: 0.8 Kilometers (0.5 Miles) East; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15257, -123.557376; Site Description: This site has converted from gravel/cobble substrate to all sand. Since 2013, seaweed has been completely absent.

GP2 East Transect – 2017
GP2 East Transect – 2017
GP2 East Transect – 2017

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand mixture.

GP2 West Transect – 2017
GP2 West Transect – 2017
GP2 West Transect – 2017

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 12.7 Meters (41.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

A2 East Transect – 2017
A2 East Transect – 2017
A2 East Transect – 2017

Permanent Site: A2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Five species of seaweeds are present though not abundant.

Permanent Site: A2 East Transect; Depth: 12.9 Meters (42.3 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.58766124; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud. Five species of seaweeds are present though not abundant.

A2 West Transect – 2017
A2 West Transect – 2017
A2 West Transect – 2017

Permanent Site: A2 West Transect; Depth: 12.8 Meters (42.0 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

Permanent Site: A2 West Transect; Depth: 12.8 Meters (42.0 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

C1 East Transect – 2017
C1 East Transect – 2017
C1 East Transect – 2017

Permanent Site: C1 East Transect; Depth: 8.5 Meters (28.0 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:05 seconds).

Permanent Site: C1 East Transect; Depth: 8.5 Meters (28.0 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57294101; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:05 seconds).

C1 West Transect – 2017
C1 West Transect – 2017
C1 West Transect – 2017

Permanent Site: C1 West Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:04, 0:38 seconds).

Permanent Site: C1 West Transect; Depth: 9.3 Meters (30.4 Feet); Distance from river mouth: 0.7 Kilometers (0.4 Miles); Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14525225,-123.57361291; Site Description: Substrate is entirely sand. Current was high and contained lots of drift seaweed and eelgrass (0:04, 0:38 seconds).

A1 East Transect – 2017
A1 East Transect – 2017
A1 East Transect – 2017

Permanent Site: A1 East Transect; Depth: 7.7 Meters (25.4 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to still be buried.

Permanent Site: A1 East Transect; Depth: 7.7 Meters (25.4 Feet); Distance from river mouth: 1.8 Kilometers (1.1 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.5855312; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud. Previous small boulders appear to still be buried.

A1 West Transect – 2017
A1 West Transect – 2017
A1 West Transect – 2017

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders.

Permanent Site: A1 West Transect; Depth: 8.7 Meters (28.7 Feet); Distance from river mouth: 1.9 Kilometers (1.2 Miles) West; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13870775, -123.586203; Site Description: Transect is in eastern part of Freshwater Bay. Sediment is primarily sand/sandy mud with patches of boulders.

H2 East Transect – 2017
H2 East Transect – 2017
H2 East Transect – 2017

Permanent Site: H2 East Transect; Depth: 7.6 Meters (24.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

Permanent Site: H2 East Transect; Depth: 7.6 Meters (24.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53210661; Site Description: This site is medium to shallow depth.

H2 West Transect – 2017
H2 West Transect – 2017
H2 West Transect – 2017

Permanent Site: H2 West Transect; Depth: 7.3 Meters (23.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

Permanent Site: H2 West Transect; Depth: 7.3 Meters (23.8 Feet); Distance from river mouth: 2.6 Kilometers (1.6 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15008216,-123.53277857; Site Description: This site is medium to shallow depth.

K1 East Transect – 2017
K1 East Transect – 2017
K1 East Transect – 2017

Permanent Site: K1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 East Transect; Depth: 6.2 Meters (20.4 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.5101581; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

K1 West Transect – 2017
K1 West Transect – 2017
K1 West Transect – 2017

Permanent Site: K1 West Transect; Depth: 5.5 Meters (18.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

Permanent Site: K1 West Transect; Depth: 5.5 Meters (18.0 Feet); Distance from river mouth: 4.5 Kilometers (2.8 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.13592923,-123.51082988; Site Description: This is a shallow site. Sediment is a gravel/sand mixture.

F2 West Transect – 2017
F2 West Transect – 2017
F2 West Transect – 2017

Permanent Site: F2 West Transect; Depth: 11.1 Meters (36.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly a gravel/cobble mixture with an occasional boulder. Seven species of brown seaweed were present.

Permanent Site: F2 West Transect; Depth: 11.1 Meters (36.3 Feet); Distance from river mouth: 1.5 Kilometers (0.9 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15672004,-123.55036603; Site Description: Substrate is mainly a gravel/cobble mixture with an occasional boulder. Seven species of brown seaweed were present.

E2 East Transect – 2017
E2 East Transect – 2017
E2 East Transect – 2017

Permanent Site: E2 East Transect; Depth: 15.1 Meters (49.4 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: Video is only of the last 10 meters of the transect. This is one of our deeper sites.

Permanent Site: E2 East Transect; Depth: 15.1 Meters (49.4 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: Video is only of the last 10 meters of the transect. This is one of our deeper sites.

E2 West Transect – 2017
E2 West Transect – 2017
E2 West Transect – 2017

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.9 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.9 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

H1 East Transect – July 2017
H1 East Transect – July 2017
H1 East Transect – July 2017

Permanent Site: H1 East Transect; Depth: 5.2 Meters (16.9 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.2 Meters (16.9 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 West Transect – 2017
H1 West Transect – 2017
H1 West Transect – 2017

Permanent Site: H1 West Transect; Depth: 5.4 Meters (17.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.4 Meters (17.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.