Skip to main content
U.S. flag

An official website of the United States government

Videos

See our science in action.

Filter Total Items: 520
H1 East Transect – March 2017
H1 East Transect – March 2017
H1 East Transect – March 2017

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.9 Meters (19.5 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

H1 East Transect – February 2017
H1 East Transect – February 2017
H1 East Transect – February 2017

Permanent Site: H1 East Transect; Depth: 5.8 Meters (19.1 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 East Transect; Depth: 5.8 Meters (19.1 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 6 years post-dam removal; Lat/Long: 48.1479177,-123.53472865; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

PubTalk 11/2016 — Ecological Stressors
PubTalk 11/2016 — Ecological Stressors
PubTalk 11/2016 — Ecological Stressors

Ecological Stressors: It's a Lot of 'WERC'
"There's is no place like California" by A. Keith Miles, Center Director, USGS Western Ecological Research Center

Highlights of the science of the USGS Western Ecological Research Center: 

Ecological Stressors: It's a Lot of 'WERC'
"There's is no place like California" by A. Keith Miles, Center Director, USGS Western Ecological Research Center

Highlights of the science of the USGS Western Ecological Research Center: 

Detecting Invasive Species in the Field: Portable eDNA Screening Tool
Detecting Invasive Species in the Field: Portable eDNA Screening Tool
Detecting Invasive Species in the Field: Portable eDNA Screening Tool

The USGS field tested the use of a portable hand-held kit for the detection of the environmental DNA (eDNA) of Asian carps (bighead carp and silver carp) in water samples as part of on-going invasive species detection research. The goals of the USGS-led research are to develop a method and kit that can be used on-site to detect Asian carp eDNA within one hour.

The USGS field tested the use of a portable hand-held kit for the detection of the environmental DNA (eDNA) of Asian carps (bighead carp and silver carp) in water samples as part of on-going invasive species detection research. The goals of the USGS-led research are to develop a method and kit that can be used on-site to detect Asian carp eDNA within one hour.

USGS Hammond Bay Biological Station Renovation — Time Lapse
USGS Hammond Bay Biological Station Renovation — Time Lapse
USGS Hammond Bay Biological Station Renovation — Time Lapse

Watch as the USGS Hammond Bay Biological Station water tank and pump house are constructed from the ground up! This short video features time lapse photography of the 1-million gallon water tank and pump house constructed to supply water to a state-of-the-art aquatic science laboratory.

Watch as the USGS Hammond Bay Biological Station water tank and pump house are constructed from the ground up! This short video features time lapse photography of the 1-million gallon water tank and pump house constructed to supply water to a state-of-the-art aquatic science laboratory.

First Days - Harlequin Ducks
First Days - Harlequin Ducks
First Days - Harlequin Ducks

This ridiculously cute video of baby Harlequin Ducks (Histrionicus histrionicus) shows their first day outside the egg (about 20 hours old). Scientists at Patuxent Wildlife Research Center are training ducks to respond to sounds — just like a hearing test given to kids during elementary school — to learn more about their ability to hear underwater.

This ridiculously cute video of baby Harlequin Ducks (Histrionicus histrionicus) shows their first day outside the egg (about 20 hours old). Scientists at Patuxent Wildlife Research Center are training ducks to respond to sounds — just like a hearing test given to kids during elementary school — to learn more about their ability to hear underwater.

Eagle Tracking
Eagle Tracking
Eagle Tracking

Cell phone video of USGS biologist Diego Johnson releasing a golden eagle that had just been fitted with a tracking device.  The work is informing land managers on eagle movements in the southwest, an area of expanding renewable energy development.

Cell phone video of USGS biologist Diego Johnson releasing a golden eagle that had just been fitted with a tracking device.  The work is informing land managers on eagle movements in the southwest, an area of expanding renewable energy development.

Tarantula Hawk
Tarantula Hawk
Tarantula Hawk

Tarantula hawk wasps sting and paralyze tarantulas to feed their young. USGS Ecologist Todd Esque captured this video of a tarantula hawk wasp dragging a tarantula through the desert in Mexico. 

Tarantula hawk wasps sting and paralyze tarantulas to feed their young. USGS Ecologist Todd Esque captured this video of a tarantula hawk wasp dragging a tarantula through the desert in Mexico. 

E2 East Transect – 2016
E2 East Transect – 2016
E2 East Transect – 2016

Permanent Site: E2 East Transect; Depth: 14.3 Meters (46.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. A few brown acid kelps (Desmarestia spp.

Permanent Site: E2 East Transect; Depth: 14.3 Meters (46.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002,-123.56130401; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with an occasional boulder. A few brown acid kelps (Desmarestia spp.

E2 West Transect – 2016
E2 West Transect – 2016
E2 West Transect – 2016

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

Permanent Site: E2 West Transect; Depth: 14.6 Meters (47.8 Feet); Distance from river mouth: 0.9 Kilometers (0.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.15653002, -123.56197605; Site Description: This is one of our deeper sites. Substrate is mainly gravel/cobble with scattered boulders.

J1 West Transect – 2016
J1 West Transect – 2016
J1 West Transect – 2016

Permanent Site: J1 West Transect; Depth: 9.8 Meters (32.3 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrate is mainly a gravel/sand mixture.

Permanent Site: J1 West Transect; Depth: 9.8 Meters (32.3 Feet); Distance from river mouth: 6.6 Kilometers (4.1 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.13607725,-123.48002186; Site Description: This site is medium depth. Substrate is mainly a gravel/sand mixture.

D2 West Transect – 2016
D2 West Transect – 2016
D2 West Transect – 2016

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

Permanent Site: D2 West Transect; Depth: 12.8 Meters (41.9 Feet); Distance from river mouth: 0.3 Kilometers (0.2 Miles); Pre/Post Dam Removal: 5 years post-dam removal Lat/Long: 48.15233001,-123.56896603; Site Description: This site is right off the mouth of the river. Substrate is mainly gravel with some cobble.

Golden Eagle Flight
Golden Eagle Flight
Golden Eagle Flight

Golden eagles can be killed by colliding with a number of human-made objects, including wind turbines. USGS research wildlife biologist Todd Katzner describes his studies of golden eagle flight. This research is being done to model flight behavior which might help managers understand how placement of wind turbines might pose significant risks to golden eagles.

Golden eagles can be killed by colliding with a number of human-made objects, including wind turbines. USGS research wildlife biologist Todd Katzner describes his studies of golden eagle flight. This research is being done to model flight behavior which might help managers understand how placement of wind turbines might pose significant risks to golden eagles.

GP2 West Transect – 2015
GP2 West Transect – 2015
GP2 West Transect – 2015

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

Permanent Control Site: GP2 West Transect; Depth: 13.0 Meters (42.6 Feet); Distance from river mouth: 18.8 Kilometers (11.6 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31712832; Site Description: This site was established as the eastern control. Substrate is mainly a gravel/sand/cobble mixture surrounding boulders.

GP1 East Transect – 2016
GP1 East Transect – 2016
GP1 East Transect – 2016

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 East Transect; Depth: 7.5 m (24.7 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long:; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP1 West Transect – 2016
GP1 West Transect – 2016
GP1 West Transect – 2016

Permanent Control Site: GP1 West Transect; Depth: 7.9 m (25.9 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

Permanent Control Site: GP1 West Transect; Depth: 7.9 m (25.9 feet); Distance from river mouth: 19.0 Kilometers (11.8 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.11852521,-123.31605203; Site Description: This site was established as the eastern control. Depth is medium-shallow.

GP2 East Transect – 2016
GP2 East Transect – 2016
GP2 East Transect – 2016

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

Permanent Control Site: GP2 East Transect; Depth: 13.2 Meters (43.4 Feet); Distance from river mouth: 18.8 Kilometers (11.7 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.12781102,-123.31645664; Site Description: This site was established as the eastern control. Substrate is mainly a gravel sand mixture.

H1 West Transect – 2016
H1 West Transect – 2016
H1 West Transect – 2016

Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

Permanent Site: H1 West Transect; Depth: 5.7 Meters (18.7 Feet); Distance from river mouth: 2.4 Kilometers (1.5 Miles) east; Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14803012,-123.53535558; Site Description: This is a shallow site and one of the farthest removed from the effects of the sediment plume outside of the control sites.

C2 West Transect – 2016
C2 West Transect – 2016
C2 West Transect – 2016

Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

Permanent Site: C2 West Transect; Depth: 16.5 Meters (54.2 Feet); Distance from river mouth: 0.7 Kilometers (0.5 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.147841,-123.57663268; Site Description: One of our deepest sites. Substrate is all muddy sand. Seaweed is absent. Woody debris is present (1:18 seconds).

A2 West Transect – 2016
A2 West Transect – 2016
A2 West Transect – 2016

Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.

Permanent Site: A2 West Transect; Depth: 13.2 Meters (43.2 Feet); Distance from river mouth: Kilometers 1.8 (1.1 Miles); Pre/Post Dam Removal: 5 years post-dam removal; Lat/Long: 48.14130295, -123.5883331; Site Description: One of our deeper sites at over 40 feet. Sediment is primarily sand/sandy mud with scattered boulders.